Steel barrel painter's labor protection

Steel barrel painter's labor protection

Shanghai Xugong Coating Technology Co., Ltd. Xu Guoxing

The harm caused by paint construction to the human body and the pollution caused by the environment is far more serious than the paint production. Moreover, the paint used in the steel drum industry generally has a solid content of less than 50%, and the rest is organic solvent, which is volatilized during construction. In the environment, it pollutes the environment and causes harm to the human body.

Solvent gases volatilized in the air can invade, stimulate and destroy human skin, central nervous system, hematopoietic organs, respiratory system, and the like. At low concentrations, it can cause dizziness, nausea, and chest tightness, which can cause serious poisoning or even life-threatening at high concentrations. People who have been exposed to paint solvent gas for a long time are most prone to loss of appetite, poor memory and insomnia, and chronic poisoning, so labor protection is particularly important for painters in the steel drum industry.

In the absence of security and protection equipment, we should first take the minimum prevention and protection measures.

1. The construction operator should be familiar with the paint performance, construction requirements and safety measures used.

2, when spraying paint by hand, you must wear anti-virus masks and protective gloves, wear long-sleeved tight overalls, it is best to wear glasses. Especially when spraying chloranil or perchloroethylene lacquer, be sure to stand on the wind and wear a gas-filled gas mask to prevent the paint from coming into contact with the skin and solvent gas directly into the respiratory system.

3, the workplace must have good ventilation, anti-virus, dust and other facilities. In the absence of protective equipment, care should be taken to circulate air to accelerate the escape of toxic gases.

4. When you have paint on your hands, do not use benzene solvents for scrubbing. Star protection should be worn with gloves or medical Vaseline.

5. In order to prevent the contamination of the skin by organic solvents and their gases, invisible gloves can be applied. This solution is insoluble in paints and solvents. A film is formed a few minutes after application to protect the hands from paint and solvents, and to moisturize the skin. After the work is finished, it is very convenient to wash with soap in warm water.

Glycerin 9.4%; casein 12%; alcohol 42.8%; distilled water 33.8%, ammonia 2%.

Dissolve the casein in distilled water with ammonia solution and mix thoroughly. Then add alcohol and glycerin to mix and use.

6, Hongdan anti-rust paint because it contains more lead tetraoxide, it is best to use the brushing method, not sprayed to avoid direct diffusion of lead in the air by spraying directly into the human body . Or replace the red dan paint with other anti-rust paint.

7. The operator should not eat at the construction site. Wash hands and wash your face with soap before or after work, and change the overalls to take a shower. When you feel that the trachea is dry, you should drink more sugary water.

8. If the operator feels headache, dizziness, nausea, etc. at work, he should leave immediately. At the work site, take a rest in the fresh air. If it is more serious, it should be sent to the hospital for treatment and treatment immediately.

9. The operator should perform regular physical examinations, and those who have symptoms should be treated promptly and removed from the paint construction post.

10, the paint construction site must be equipped with fire-fighting equipment, mainly foam fire extinguishers or carbon dioxide fire extinguishers. In addition, yellow sand is also a very effective fire extinguishing equipment.

It should be noted that in the event of a fire, do not use water to save the paint or solvent. In order to avoid the burning of paint or solvent floating on the surface of the water to expand the fire source.

The above matters are expected to attract the attention of paint construction personnel and management personnel.

Photo Slate

GlazeKing Ceramics TechnologyCo.,Ltd. , https://www.maglazekingceramics.com