Many of my friends didn't know the specific details of the second renovation of the bathroom. Xiao Bian specially collected the details of a netizen in the second renovation of the bathroom for your reference. The details of the second renovation of the bathroom Preparation before the renovation: 1, the floor drain to buy. The location of the floor drain should be fixed, the floor drain of the washing machine, the floor drain of the mop pool, the floor drain of the shower room, the floor drain of the bathtub, and the leakage of the hand basin are all in advance. And buy a spare. 2. The exhaust fan odor check valve is ready. The exhaust fan is bought or the size is good. (Some exhaust fans with strong wind or weak, or with a bath function, need to lay a special line when wiring) 3, the socket switch to buy, the location of the socket switch is fixed, in accordance with my experience, the socket to buy a socket with a switch, it is not used to pull back and forth the plug, very convenient, conducive to power saving. 4, the amount of seating is good, the size of the reservation is good, the best place to stay at the top of the toilet is Jiele's power socket, one day can be used. 5, shower room or bathtub must be specified in advance, the size of the shower room should be prepared in advance. At that time, it is necessary to tell the bricklayer of the magnetic tile in detail so that the water flow direction is accurate and does not accumulate water. 6, the size of the wash basin or bathroom cabinet should be advanced in advance. The layout of the bathroom is well prepared in advance. No need to position the pipe when it is not right Sign the contract, communicate with the captain of the decoration, and emphasize that you should start work after the gap period. It is best to do protection before starting work, because unexpected dust can be very large. So, wherever the dust can go, try to make everything disappear, even including curtains. If you can't move it, just pack it with a strap or a plastic wrap. Preparation: cement sand pipe tiles and many other things. Enter the game one day in advance. Decoration process Day 1: Demolition Usually, the electrician will dismantle the old ones, and the people who dismantle them will be the ones who will be pressed later Be sure to communicate which ones have been removed and which have to be installed. In addition, be sure to communicate the door nose you have removed, the door lock, the broken faucet, the radiator, etc., let him take it or leave it. If you don't say it, he usually takes it away. He sold the waste. Must be clear. Day 2-3: Demolition of the wall The wall was very noisy. It is easy to cause neighborhood disputes. In addition to the notice, try not to do it around 12:00-2:00. Otherwise, the old ladies are hard to get entangled. When the wall is smashed, the soil in the flue may go to the neighbor's house along the exhaust fan. If you meet a difficult neighbor, you have to pay for it or not. Buy a good bag in advance as a garbage bag, and go back downstairs until the renovation is over. 3-4 days of pipe routing: very very dirty, dirty over the wall. Pipe: including hot and cold water pipes, heating pipes. These are the most expensive things. Pipe fittings are very expensive. But there is no way. Try to make the position of the tube as you like it. Don't be afraid that the other person is embarrassed. The position of the radiator has recently been popular on the toilet. When there is no heating, it is a towel rack. When there is heating, it is a sock. Wiring: The power plug switch must be close to the object. Don't feel the line everywhere. It is convenient to have a power plug with a switch. Test hydropower. After no problem, the bricklayer entered. 4th-8th day Magnetic tile process Bubble brick: more than half a day. At the same time wipe the wall. Watch the flue when you wipe the wall. Wall waterproof, waterproof paint to buy a little better. Note that the pipes that are heated by others are also waterproof. Wall tiles. And the cement sand is in the bathroom and in the room. Do not block the place. Waterproof on the ground, test the water. Stick the floor tiles, explain and stare at the flow of water on the ground, and strive for success. The floor drain is ready. Exit, can not enter the bathroom for 2 days. Said to be 24 hours, I insisted on 36 hours. Otherwise it is easy to press down. You can't open your eyes on the 72-hour wall. Said to be 48 hours. If you need to make a toilet door, stick the magnetic tile and then measure the door. Otherwise, each person's hand is different, and the thickness of the magnetic tile is not the same. So don't worry about booking in advance. On the 9th day, the ceiling came into play. Try not to use plastic ceilings. Because there is still a line on the top, it is too much effort to repair an exhaust fan. That kind of buckle is good on the top. It can be sucked up easily by the suction cup. Note on the ceiling: The height of the ceiling should be well grasped. If you accidentally dangle it for convenience, it will be bad. There is also a fan duct for the fan to be glued. Put the check valve that was bought in advance together. Put on the glass glue and fix it. In addition to paying attention to the aftertaste of the floor drain, the toilet is the aftertaste of the flue. Very important. The lamp is in the center and the exhaust fan is above the toilet. The switch is preferably next to the toilet. This stinks and aligns immediately. The 10th day electrician entered the market The electrician does the socket switch and the shower room and other installations. This link is the most easily overlooked and most important link. To track the whole process. The faucet does not sway. Have you installed the correct location? Whether the shower is installed beautifully. The location of the tissue box is within reach. Whether the tube of the nozzle is unsightly. and many more. To fully grasp. Day 11 bathroom cabinet mirror comes into the scene When you are in the bathroom cabinet, you should clearly indicate the left and right position. The height of the mirror. Also check the mirror for scratches. Buy your own angle valve in advance. Their angle valves are not good. Although you can't see the place, you should pursue perfection. After all, the money is almost On the 12th day, water heaters, radiators, etc. will enter the market. The final entrance to the wall can be eye-catching. The basics are over. Call to hire a car to pull the garbage. The cost is around 300. The second renovation of the entire bathroom is over. Editor in charge: Liang Wei Emergency Stretcher,Adjustable Patient Stretcher,Hospital Emergence Stretcher,Patient Emergency Trolley Jiangmen Jia Mei Medical Products Co.,Ltd. , https://www.jiamei-medical.com
The details that the bathroom must be noticed in the second renovation